Solar Panel Roof Replacement in Bloomfield Center from $250. $250 to $350 a panel to take the array off and put it back -- and the order you do things in is worth $5,000. Free inspection and a written quote.
Arrays are rare on the mixed-use stock here, and where one exists it is usually a flat-roof ballasted system rather than a pitched roof-mount. Those come off differently and the cost per panel is not the same -- worth establishing which you have before anybody quotes either.
Removing a solar array so the roof under it can be replaced, and reinstalling it afterwards, costs $250 to $350 per panel in New Jersey. On a 26-panel system that is roughly $5,000 to $6,500, and across the normal range of residential systems $4,500 to $9,500. It adds four to seven days: a day to take the array down, two to five days of roofing, a day to put it back.



Removing a solar array so the roof underneath can be replaced, and reinstalling it afterwards, costs $250 to $350 per panel in New Jersey -- roughly $5,000 to $6,500 on a 26-panel system and $4,500 to $9,500 across the normal range of residential systems. It adds a day off, two to five days of roofing, and a day back. Priced as commercial low-slope work rather than as a house. Access through a tenancy, hours that fit a trading business and a parapet with internal drainage are the real lines here, and almost none of this stock carries solar.
If the covering has ten years left and the panels have not gone on yet, replace the roof first: the removal cost never happens. Doing it the other way round means paying five figures' worth of trades to undo work finished the year before.
Electrical disconnect, removal and labeling, secure storage while the roof is open, reinstallation on the new covering, reconnection, and a production check afterwards. A quote that does not list those has not scoped the work.
Panel count, because the price scales with panels and not roof area. A complicated roof where the mounting is spread across planes rather than run in clean rows. And a ballasted flat-roof system, which comes off differently from a pitched roof-mount.
The mixed-use buildings here are the exception to everything else on this site. Flat roofs behind street parapets, internal drainage, a business trading underneath, and a route onto the roof that frequently runs through somebody's tenancy. Almost no solar, and almost all logistics.
If there is an array on the roof -- or about to be -- the sequence is worth roughly five thousand dollars, and nobody selling solar has a reason to mention it.
A covering with ten years left under panels about to be fitted should be replaced now, while the removal cost is zero. Do it in the other order and you pay a second set of trades to undo work finished the year before. This is the single most valuable sentence on this site.
Because the decision is no longer free, it is a schedule. Knowing the covering has three years rather than ten lets you plan the removal around it -- and lets you do any other roof work on the property in the same window.
On the roof itself the usual test applies: if the covering away from a leak still lies flat, holds its granules and is not brittle, the repair is the right job at $350 to $1,800 rather than a replacement at $9,500 and up.
The center is the exception to the rest of this site.
Where there is a pitched slope in the center it is usually a small street-facing section in front of a much larger flat roof.
In the center the flat roof is the whole roof, behind a street parapet with internal drainage.
The older commercial frontages are the historic stock in the center, and what matters on them is the parapet and the cornice rather than the field of the roof.
Detached garages are scarce in the center; where a property has covered parking it is more often a bay under the building or a flat roof over a rear service area.
Detached township stock. Count the panels first.
Pre-1940. Board sheathing and no ice barrier.
The biggest roofs, and the biggest arrays on them.
An 1895 planned district. Appearance is the brief.
Big Victorian roofs, and slate on a fair number.
Denser and more multi-family. Unit count decides it.
Sloping plots, ambitious shapes. Detail, not area.
Asked on every job of this kind. Answered here.
On a small localized repair, sometimes. On a replacement, no -- the covering under the array has to come off, and that means the array comes off. Anybody offering to re-roof under panels in place is describing something other than a replacement.
A qualified electrician, not us. We do roofing. The removal price includes coordinating it and the production check afterwards, but the electrical work itself is a separate trade and the scope says so rather than blurring it.
Before, if the covering has less than about fifteen years left. The removal and reinstallation cost -- $4,500 to $9,500 -- simply does not happen if the roof is already new when the array goes on. Doing it the other way round means paying a second set of trades to undo work finished the year before, and nobody selling solar has a reason to raise it.
An architectural asphalt roof runs $9,500 to $26,000, with most 2,000 square foot houses at $12,000 to $18,000 installed. Per square foot that is $5.50 to $8.00 for architectural and $4.50 to $6.50 for three-tab. If there is a solar array on the roof, add $4,500 to $9,500 and four to seven days.
It might, and we find out rather than guess. Halcyon Park was laid out in 1895 as a planned community and is a historic district; New Jersey municipalities may operate a historic preservation commission whose approval is needed for exterior changes. Whether that applies to a roof here is confirmed with the township before the work is booked.
Any array counted and priced separately, not buried in a rate. Both sequences costed, so the cheaper order is obvious.